Projects

From permit condition to dark nights.

A typical ADLS project takes 12 to 18 months. Most of it is planning and approval, not hardware.

01

Site assessment and coverage

Layout, terrain, line of sight, sensor positions.

02

Design and documentation

System design and compliance documentation for the authority.

03

Permits

Building permit for the mast, radio frequency licence, export licences.

04

Build and factory test

Mast and foundation, radar configuration, witnessed FAT, shipping.

05

Installation and integration

Commissioning, light control, ADLS network, upgrade of the lights.

06

Flight test and approval

Test flights, final authority approval, go-live.

Track record

800+ wind farms. Every night.

More than 800 wind farms with over 4,000 turbines receive their light-on and light-off signals from our transponder and radar systems. Around 100 of them are served by Senture radar.

Figures of the Light:Guard Group, of which Senture is part. As of Q3 2026.

Illustrative image: primary radar on a lattice mast at dusk, wind turbines on the hills behind, their lights dark

ALL MAJOR OEMS

We have delivered ADLS projects with all major turbine manufacturers, for new builds and existing wind farms.

ONE SIGNAL THAT MATTERS

Light on or light off, delivered to the light control of each wind farm, with fail-safe fallback to on.

CASE STUDIES

Most of our projects are under NDA. We share detailed references in a personal meeting.

Currently in design

300+

turbines in 3 countries for which we are designing ADLS right now, each on request of the operator or the turbine manufacturer.

COUNTED: projects with active technical work for the customer in the last six months. NOT COUNTED: offers and tenders without technical work. As of Q3 2026, updated quarterly.

WHERE THESE PROJECTS STAND

01

Site analysis and sensor design

02

Technical alignment with the turbine OEM

03

Documentation for the authority

04

Waiting for permit or financial close

ADLS is usually ordered after the permit or financial close of the wind farm. Design work starts long before that, so our customers know early what their ADLS will need.

Company

ADLS is systems integration. We lead it.

An ADLS brings together radar, masts, networks and turbine controls from different specialists. Senture owns the parts that decide success: coverage planning, authority documentation, system design and project management.

For radar hardware, civil works and installation we work with specialist partners, and you still have one contract and one accountable contact.

RADAR

Terma

TURBINE OEMS

Projects with all major manufacturers

CIVIL AND INSTALLATION

Specialist partners in each market

SERVICE

Remote monitoring, O&M, reporting

Certified quality management to DIN EN ISO 9001:2015Scope: sales of sensor systems and their system integration into the network environment of wind farm structures. Certified by TÜV Hessen, valid until July 2028.
View certificate (PDF)

Site assessment

Tell us about your wind farm.

With the turbine layout we can give you a first coverage assessment and an indicative budget.

Senture GmbH
Krendelstraße 32, 30916 Isernhagen, Germany

We use your details and files only to answer this request. More in the privacy policy.