What to do with older wind turbines without an ADLS interface?

Many older turbines have hard-wired obstruction lights. BeaconLink makes them ADLS-ready without complex SCADA integration.

Marketing Team Updated 1 min read Also in Norsk Deutsch

Demand-controlled lighting requires that the wind turbine can execute the signal to switch the lights on and off. Newer turbines are prepared for this. On many older turbines, however, the obstruction lighting is hard-wired or not connected to an interface through which an ADLS can control the lights.

For operators of such turbines, the question is whether retrofitting is possible and how much effort it takes. In Germany, the obligation to install aircraft detection lighting under Section 9(8) EEG generally also applies to existing turbines. Exemptions only apply if retrofitting is economically unreasonable, and the operator must justify this.

With BeaconLink, Senture offers retrofit kits that make older turbines ADLS-ready. The lights are replaced, but no complex subsequent integration into the turbine control system (SCADA) is required. The kits are available for high-, medium- and low-intensity lights. This allows older turbines to be integrated into a demand-controlled system, and the condition of the lamps can be monitored remotely (remote monitoring).

Operators running older and newer turbines in one wind farm, or considering an exemption for older turbines, should evaluate retrofitting as an option before applying for an exemption.