Norway: Luftfartstilsynet updates guidance for demand-controlled obstruction lights

On 30 September 2026, Luftfartstilsynet updated its guidance on BSL E 2-1. The key requirements of § 7a at a glance.

Marketing Team Updated 2 min read Also in Norsk

On 30 September 2026, the Norwegian Civil Aviation Authority (Luftfartstilsynet) updated its guidance on regulation BSL E 2-1. Among other things, it explains what § 7a requires for demand-controlled obstruction lighting (behovsstyrt tenning av hinderlys).

The key points:

  • Every system requires approval from Luftfartstilsynet. Approval is site-specific and covers the turbines and the area applied for.
  • Before the application, a meeting with the authority takes place in which the applicant presents the system concept, the operational concept and the implementation plan.
  • The system must detect civil transponders and transmitters: Mode A/C, Mode S with or without ADS-B, and ADS-B transmitters. No additional equipment on board may be required.
  • For aircraft with a transponder, the lights must switch on at least 6,000 m before the nearest obstacle; for aircraft without a transponder, at least 1,500 m before.
  • Detection must cover all sectors from 100 ft above ground up to 2,000 ft above the highest obstacle. Where full coverage is not possible, alternative measures are required.
  • The system monitors itself. In the event of a fault, the lights switch on automatically.
  • Before commissioning, test flights in all sectors and a performance report with a verified coverage map are required.

The application therefore covers much more than the technology: organisation, maintenance and training programmes and proof of financial capacity are part of it.

Source: Luftfartstilsynet, Veiledning til BSL E 2-1

This article reflects the rules as of its date. It is not legal advice.